Friday, April 23, 2010

Bathroom remodel - part 2

Deconstruction in process. This is looking into the space from our office. The door on the left was the original door into our bedroom. We've since relocated that door (it's behind me on the left). You can see on the ceiling a strip that is brighter. That's where the old bathroom wall was located. It's gone now, effectively doubling the size of the bathroom. Where the chair is in the picture is approximately where the new bathroom door is located. For this picture, I'm standing in about the same place as the last one, but the door has been framed, the plumbing completed, and the drywall put up. What you see is the future location of the washer/dryer.
Pan right, and on the right wall is the hook-up for the sink. It's about in the same place as before.




No comments: